The Latest IN EKIN ENGINEERING INNOVATION
CONFLAT
CONFLAT is a front-mounted concrete floor flatness and rectification system designed to improve surface regularity during the power trowel finishing process.
Its twin straightedges can be pitched forwards or backwards to smooth the concrete or cut localised high spots, providing a controlled alternative to traditional manual straightedge and bump-cutting methods.
Positioned within the operator’s field of view, CONFLAT is quick to remove and can accommodate different straightedge lengths to suit FM, SR and other high-tolerance concrete floor requirements.
AVAILABLE TO PURCHASE OR HIRE EXCLUSIVELY FROM CONCRETE SERVICES & SUPPLIES
TWIN STRAIGHTEDGE SYSTEM
✅ Twin straightedges work together as one assembly
✅ Can be pitched forwards or backwards to smooth or cut
✅ Straightedge lengths can be changed to suit different floor requirements
✅ Suitable for SR, FM and other specialist floor specifications
QUICK-MOUNT FRONT SYSTEM
✅ Front-mounted within the operator’s field of view
✅ Clear visibility of the area being rectified while travelling backwards
✅ Secure three-pin mounting system
✅ Quick and easy to fit or remove from the power trowel
ELECTRIC CONTROL
✅ Raise or lower the straightedge assembly whenever required
✅ Powered adjustment using electric actuators
✅ Simple operator controls for height and pitch adjustment
✅ Powered directly from the power trowel battery